IPM Italia spaziatore
IPM Italia: Industrial floorings - Resinous floorings - Concrete floorings
spaziatore
spaziatore head line
change languagehead line
spaziatore
banner
spaziatoreNews Fairs, Events and  Sponsorship for the year 2011
spaziatore
manufactoring process
spaziatore
 

Whether we speak of concrete and resinous coatings on new floorings or damaged  floorings, the starting idea is that to propose the most suitable solution for each type of activity and, within it, for each type of place.  

MANUFACTURING PROCESS starts from the analysis of the type of support and from the choice of the most suitable cycle decided on the basis of final stress to which the flooring is subjected and of aesthetical features required.
 
spaziatore preparation of the support
preparazione preparazione

spaziatore
  Preparation of the support includes all operations necessary to make it suitable for bearing load stress and assuring a perfect adhesion of the resinous coating.  
     
 
  photo smoothing
1-SMOOTHING
Mechanical action done by means of DIAMOND INSERTS aimed at removing a certain quantity of material and making  the support more REGULAR and FLAT

photo coring and injections
4-CORING AND INJECTIONS
Check of thickness or consolidation of the
support by means of resin and quartz injections



photo sealing of joints
7-SEALING OF JOINTS
Expansion and control joints executed with IPM RESIFLEX epoxy-polyurethane formula

photo gouges
8-GOUGES
Elastomeric gouge finishing

photo adhesion promoter
9-ADHESION PROMOTER
Application of specific epoxy primer for support consolidation and better adhesion of further treatment

photo peening
2-PEENING
Roughening action of the surface by means of high-pressure steel spheres



photo crackings care
5-CRACKS CARE
Important and undersize cracks subject to motion are treated with PERPENDICULAR CUTS and equipped with THREADED BARS


photo construction joints
7-CONSTRUCTION JOINTS
Executed with mechanical joints


photo gouges
8-GOUGES
Floorings with elastomeric gouge

photo foundation leveling
10-FOUNDATION LEVELING
Application of epoxy formula charged with aggregates in order to regularize the foundation
photo milling
3-MILLING
Dry mechanical action to remove big quantities of loose and/or polluted material



photo crackings care
6-CRACKS CARE
Cracks previously treated are FILLED UP and REINFORCED  



photo construction joints
7-CONSTRUCTION JOINTS
Mechanical structural joints


photo gouges
8-GOUGES
IPM Colormix gouge system

photo recovery of height
11-RECOVERY OF HEIGHT
Application of epoxy mortar suitably charged with aggregates in controlled grain size
 
spaziatoreIndustrial floorings - Resinous floorings - Concrete floorings - IPM Italia S.r.l - Viale delle Industrie 23 - 20884 SULBIATE (MB) - ITALY - p.iva 00812830966
spaziatore